PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started pouring concrete at Stairs -5 Facing North (800x600).jpg Steel column at Monumental Stairs Facing South(800x600).jpg Poured concrete at Stairs -5 (1) Facing North (800x600).jpg Poured concrete at Stairs -5 (2) Facing North (800x600).jpg Poured concrete at the Trench Drains Rooms 141,142,145 Facing North-West (800x600).jpg Project Site Facing North-West (800x600).jpg Steel column at Monumental Stairs Facing East (800x600).jpg
Previous pageNext page Poured concrete at the Trench Drains Rooms 141,142,145 Facing North-West (800x600)
Poured concrete at the Trench Drains Rooms 141,142,145 Facing North-West (800x600)